Production Part Approval Process (PPAP)

Become versed on the procedures, reporting requirements and activities specified by the AIAG PPAP manual. Whether you are familiar with the PPAP requirements and need to understand the changes to the newly released fourth edition manual or you are new to PPAP altogether, this seminar will provide useful information.

Seminar Content
Introduction to PPAP

  • Applicability
  • Relationship to ISO/TS 16949
  • Relationship with APQP
  • The 19 Items of PPAP
  • Organization of the AIAG PPAP Manual

Requirements

  • General Requirements
  • Significant Production Run
  • Design Records
  • Authorized Engineering Changes
  • Engineering Approvals
  • DFMEA
  • Process Flow Diagrams
  • PFMEA
  • Dimensional Results
  • Engineering Test Results
  • Initial Process Studies
  • Measurement System Analysis
  • Qualified Laboratory Documentation
  • Control Plan
  • Bulk Material Requirements Checklist
  • Appearance Approval Request
  • Part Submission Warrant
  • Sample Parts
  • Checking Aids
  • Master Samples
  • Customer-specific Requirements

Customer Notification and Submission Requirements

  • Customer Notification
  • Submission to the Customer
  • Situations Where Notification is not Required
  • Submission Levels
  • Part Submission Status
  • Record Retention

Customer Specific Requirements

  • DaimlerChrysler
  • Ford
  • General Motors

To request a quote, contact:
Elena O'Connor, On-site Programs
Phone: (734) 487-4926



 
   


Eastern Michigan University
Center for Quality

103 Boone Hall
Ypsilanti, MI 48197
Barbara Hopkins, Director


Phone: (734) 487-2259
Toll Free: (800) 932-8689
Fax: (734) 481-0509

     View our Privacy Policy
EMU Home